Satellite platform is fully operational. We have two-sided data communication.
Deployable systems were deployed:
csp-term # mt sw
MT switches (res=0):
ANT1 switch[1]: RELEASED
ANT1 switch[2]: RELEASED
ANT1 switch[3]: RELEASED
ANT1 switch[4]: RELEASED
ANT2 switch[1]: RELEASED
ANT2 switch[2]: RELEASED
ANT2 switch[3]: RELEASED
ANT2 switch[4]: RELEASED
HM screw: RELEASED
HM spring: RELEASED
Solar screw: RELEASED
Optics 1: closed
Optics 2: closed
Solar spring: RELEASED
Optics is closed according our plan.
EPS parameters:
csp-term # obc wod
su: 0, fw: 0, bc: 0
battery volt: 8.250
battery curr: 0.299
3v3 curr: ?
5v0 curr: 0.100
temp com: 11.00
temp eps: 11.00
temp bat: 10.00